Image 6 of 7
Mechanical Plant Piping Model
Everything you need to pipe up a basic HW and CHW Plant. Provided with 6 feet of white Pex-B that you can cut and replace as needed to layout your own system. Main components are weighted for stability.
Base kit includes:
1 Air-cooled chiller
1 Condensing boiler
2 Floor-mounted pumps
2 In-line pump
1 Expansion tank
1 Deaereator tank
4 straight connectors
24 Elbows
4 Tees
2 2-way valves
2 3-way valves
1 Wall section
4 Flow direction indicators
Everything you need to pipe up a basic HW and CHW Plant. Provided with 6 feet of white Pex-B that you can cut and replace as needed to layout your own system. Main components are weighted for stability.
Base kit includes:
1 Air-cooled chiller
1 Condensing boiler
2 Floor-mounted pumps
2 In-line pump
1 Expansion tank
1 Deaereator tank
4 straight connectors
24 Elbows
4 Tees
2 2-way valves
2 3-way valves
1 Wall section
4 Flow direction indicators